Download Print this page

Krick 20360 Building Instructions page 9

Advertisement

Now glue the cockpit to the superstructure.
52
Then fit the hand rail 52.
5. Roof
The last step for the superstructure starts with
gluing the main roof (36) on top.
36
Stand Juli 2014
Now the body shell of the superstructure is
ready.
6. Alignment to Deck
At this stage the superstructure will be placed
on the deck and the curve of the lower edge
has to be aligned with the curve of the deck.
This has to be done mainly in the front area.
For this you can mark the deck line to the su-
perstructure with a pencil, laid flat onto the
deck. Then sand the curve.
7. Mast
42
Prepare the mast from the two halves 41 and
42. First glue parts 42 on part 41. Take care to
get two mirrored halves.
If you are interested to light the ships lamps on
the mast with bulbs or LEDs it is recommended
to open the ends of the prepared channels for
the cables now so that the cables can be
pushed through later. For this open the bar at
Seite 9
41
©
Krick Modelltechnik Knittlingen

Advertisement

loading

This manual is also suitable for:

Policeboat wsp 47Wsp 47