Mechanical Installation; Precautions; Prepare For An Open Engine Unit; Prepare For An Enclosed Engine Unit - Xylem FST Installation, Operation And Maintenance Manual

Table of Contents

Advertisement

3 Mechanical Installation

3.1 Precautions

Before starting work, make sure that the safety instructions in the chapter
Introduction and Safety

3.2 Prepare for an open engine unit

1. Drill a 6.35 mm (0.25 in) diameter hole at a distance of 127 mm (5 in) from
the lifting bail plate.
2. Drill one more 6.35 mm (0.25 in) diameter hole at a distance of
57.15 mm (2.25 in) from the first hole.
57.15 mm

3.3 Prepare for an enclosed engine unit

1. Drill two 6.35 mm (0.25 in) diameter holes as high as possible on the
enclosure.
FST Installation, Operation, and Maintenance Manual
on page 3 have been read and understood.
127 mm
(5 in)
(2.25 in)
∅ 6.35 mm
(0.25 in)
3 Mechanical Installation
WS011176A
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents