Moving the 1st sheet.
Arching the 2nd sheet.
Turing over the 1st sheet.
Arching the 2nd sheet.
Moving the 1st sheet.
Idly moving the 1st sheet.
(while locking the platen
upstream roller locked in place)
Moving the 2nd sheet.
F-2-16
Delivering the 1st sheet.
Idly moving the 2nd sheet.