Before installing a server, check that the guide rails of the cabinet are level, smooth, and not
deformed. This ensures surface contact between the server and the guide rails and even weight
distribution. You are advised to use the guide rails delivered with the server to ensure even
weight distribution.
The following tools are available:
l
l
l

3.4.1 Installing the Server on L-Shaped Guide Rails

L-shaped guide rails apply only to a Huawei cabinet.
Procedure
Step 1 Determine the positions for installing floating nuts. See
Figure 3-3 Positions for installing floating nuts
Step 2 Install floating nuts.
1.
Issue 26 (2018-11-19)
A faulty server needs to be replaced with a new 5288 V3.
A different rack server needs to be replaced with the server.
A server component needs to be maintained.
ESD wrist strap or ESD gloves: used to prevent ESD damage
Screwdriver: used to tighten screws on the panel
Floating nut hook: used to install floating nuts
Determine the position for installing a floating nut based on the installation plan.