MTU 12V4000M*3 series Operating Instructions Manual page 290

Hide thumbs Also See for 12V4000M*3 series:
Table of Contents

Advertisement

Preparatory steps – Vertical air intake
1.
Drain engine coolant (→ Page 315).
2.
Remove air filter (→ Page 294).
3.
Seal all openings with suitable covers.
4.
Remove charge-air pipework (1) from exhaust
turbocharger to intercooler.
5.
Remove oil lines (2).
6.
Loosen clamp (1).
7.
Remove intake housing (3) with actuating cyl-
inder (2).
288 | Exhaust Turbocharger | MS15036/00E 2018-08

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents