Use a drain hose and clamp.
Insert the drain hose into the drainage outlet until it reaches the white tape. Then tighten the clamp.
For heat insulation, wind the drain hose with sealing gaskets. Provide heat insulation to indoor drain hose.
Clamp
Tape (White)
<Precautions for drain lift pipe>
The drain lift pipe shall be installed as low as possible.
The drain lift pipe shall be perpendicular to the unit and not more than 300mm away from the unit.
In 300mm 1-1.5m
Drain hose
Clamp
Note:
• The slope of accessory drain pipe shall be within 75mm so that the drainage outlet does not necessarily bear
excessive external force.
• If multiple drain pipes join together, install them as follows.
The size of confluent drain pipe selected shall be suitable for operating capacity of the units.
(2) Check drainage is smooth after installation.
• Check drainage by filling in 1200cc water slowly from air outlet or inspection hole.
7.6 Installation instruction for embedded air-conditioning panel
1. Before installation
The trim panel shall be put on buffer materials when unpacked to prevent being scratched by hard objects.
Please confirm the following accessories delivered with the product:
Bolt (M5*25) Qty: 4
Drain hose
Hanger
T-joint confluent drain pipe
WARNING
Gasket Qty: 4
Large-size sealing gasket (accessory)
Clamp (accessory)
Drain hose
27
Below 4mm