Haier Smart Power Series Service Manual page 135

Table of Contents

Advertisement

Smart Power
7.3.1 Foundation work
• Check the strength and level of the installation ground so that the unit will not cause any operating vibration or
noise after installation.
• In accordance with the foundation drawing in the figure, fix the unit securely by means of the foundation bolts.
(Prepare four sets of M12 foundation bolts, nuts and washers each which are available on the market.)
• It is best to screw in the foundation bolts until their length are 20mm from the foundation surface.
• Fix the outdoor unit to the foundation bolts using nuts with resin washers (1) as shown in the figure.
If the coating on the fastening area is stripped off, the nuts rust easily.
Dimensions (bottom view) (unit of measurement:mm)
W
1UH200 1U250
A
B
C
D
W
H
1UH125 1UH140 1UH160
650
468
506
405
1050
1636
A. leg pitch1
B. leg pitch2
C. Front grill (air outlet side)
D. Drain hole
E. Bottom frame
F. Knock-out hole (for piping line)
600
405-410
450
368
950
1350
133
1UH071 1UH090 1UH105
600
405-410
450
368
950
965

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents