2. Commissioning

2.2.3 Valid instructions for parametrizing on the DeviceNet

2−10
When the slave features have been configured (e.g. by instal
ling the EDS file), the following steps are required for parame
trizing, depending on the configuration program.
1. Insert the slave in the project/network (online or offline).
If the slave is inserted e.g. offline, it will be selected from
the slave list and added to the network.
2. Assigning a slave to a scanner. A network can contain
several scanners. The slave must be assigned to a
scanner.
3. Determine the I/O parameters of the slave. The following
specifications are required here:
the number of I/O bytes to be transmitted. The follow
S
ing applies to node CP FB11−E:
− 2, 4, 6 or 8 input bytes occupied
− 2, 4, 6 or 8 output bytes occupied
The number of occupied I/O bytes depends on the
highest occupied string number (2 inputs and 2 out
puts on each occupied string).
Specification of communication type. The following
S
applies to node CP FB11−E:
− Polled communication
or
− Change of state / cyclic
In addition to these communication connnections a
Strobed I/O connection must be used in each case for
the diagnosis.