A. Location of installation
Check and ensure the installation location (concrete, layout, space size etc.) is
suitable for lift installation.
B. Use a carpenter's chalk line to establish
installation layout of base plate
C. Check the parts before assembly
1. Packaged lift and hydraulic power unit.
Installation Steps
Installation Steps
Chalk Line
PV-10PX / PV-10HPX
137.5 in
Fig. 5
Fig. 6
8