Installation Steps; Location Of Installation; Check The Parts Before Assembly - Atlas PV-10PX Installation & Operation Manual

10,000 lb. capacity overhead 2-post lift
Hide thumbs Also See for PV-10PX:
Table of Contents

Advertisement

A. Location of installation
Check and ensure the installation location (concrete, layout, space size etc.) is
suitable for lift installation.
B. Use a carpenter's chalk line to establish
installation layout of base plate
C. Check the parts before assembly
1. Packaged lift and hydraulic power unit.

Installation Steps

Installation Steps
Chalk Line
PV-10PX / PV-10HPX
137.5 in
Fig. 5
Fig. 6
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pv-10hpx

Table of Contents