III. INSTALLATION STEPS
A. Location of installation
Check and ensure the installation location (concrete, layout, space size etc.) is
suitable for lift installation.
B. Use a carpenter's chalk line to establish installation layout of baseplate.
(See Fig. 7)
C. Check the parts before assembly.
1. Packaged lift and hydraulic power unit (
2. Move the lift aside with a forklift or hoist, and open the outer packing carefully and
move aside the top connecting assy. and parts box
Chalk Line
Fig. 7
137 1/2"
See Fig. 8).
7
Fig. 8
(See Fig. 9).
Fig. 9