Maintenance Schedule

Monthly:

1. Re-torque the anchor bolts to 75-86 Ft Lbs;
2. Check all connectors, bolts and pins to insure proper mounting;
3. Lubricate slider groove with lubricant;
4. Make a visual inspection of all hydraulic hoses/lines for possible wear or
leakage;
5. Check the condition of the safety lock device;
6. Lubricate all rollers and pins with 90wt. Gear oil or equivalent.
NOTE: All anchor bolts should take full torque. If any of the bolts do
not function for any reason, DO NOT use the lift until the bolt has been
replaced.

Every six months:

1. Make a visual inspection of all moving parts for possible wear, interference of
damage;
2. Check and adjust as necessary, equalizer tension of the cables to ensure level
lifting;
3. Check columns for plumbness;
4. Check rubber pads and replace as necessary;
5. Check safety lock device and make sure the condition is suitable.
Maintenance Schedule
PV-10PX / PV-10HPX