Install Columns; For Model Pv-10Px - Atlas PV-10PX Installation & Operation Manual

10,000 lb. capacity overhead 2-post lift
Hide thumbs Also See for PV-10PX:
Table of Contents

Advertisement

F. Install columns
Lay down the two columns on the installation site parallel of each other. Position
the power side column according to the actual installation site. This lift is
designed with 2 sectional columns. Adjust the height according to your ceiling
height.

For model PV-10PX

1. When the ceiling height is less than 3750mm (147 5/8"), connect the
sectional columns with the upper holes.
Fig. 17 - Low Setting
Installation Steps
14
PV-10PX / PV-10HPX

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pv-10hpx

Table of Contents