Install Electrical System; Tmc-18 Contactor; Installing Safety Interrupt Switch - Atlas PV-10PX Installation & Operation Manual

10,000 lb. capacity overhead 2-post lift
Hide thumbs Also See for PV-10PX:
Table of Contents

Advertisement

R. Install Electrical System
Note: For safety of operators, the power wiring must contact the fl oor well. Pay
attention to the direction of rotations when using three phase motors.

TMC-18 Contactor

1. Motor goes to
T3(White)
2. Power goes to
L3
(White)
3. Operating Switch (OS)
Terminal 3
goes to
power connection)
4. Operating Switch (OS)
Terminal 4
goes to Relay
Terminal (RT)
A2
5. Relay Terminal (RT)
L2(Jumper wire)

*Installing Safety Interrupt Switch

6. Remove Wire From Operating
Switch (OS)
Terminal 4
Relay Terminal (RT)
7. One wire of Safety Interrupt
Switch (SS1) to Operating
Switch (OS)
Terminal 4
8. One wire of Safety Interrupt
Switch (SS2) to Relay Terminal
(RT)
A2
Installation Steps
T2
(Black ) and
L2
(Black) and
L3
(with the
Factory Installed
A1
goes to
Step 7
to
A2
Installing Safety
Interrupt Switch
PV-10PX / PV-10HPX
(220V Single Phase 60Hz 3HP)
Fig. 44
36

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pv-10hpx

Table of Contents