Fig.7.4 Concealed Cable Installation 1 (right-left wiring)
Fig.7.5 Concealed Cable Installation 2 (up-down wiring)
Serial No.
1
Wall
2
Power Supply Box (86)
3
Bottom Base(including power supply module board)
4
Screw
5
Top Cover(including the display board )
After the installation, it is necessary to make the debugging to guarantee the normal communication.
Fig. 7.6 Installation Diagram
Description
31