Xy Table Leveling - Stratasys uPrint Service Manual

Hide thumbs Also See for uPrint:
Table of Contents

Advertisement

XY Table Leveling

Parts and Tools Required
• MaracaEX CD
• XY Level Calc.xls (Excel) file
• Dial indicator
• Head bracket
• Basic tool set
• Table leveling adjustment tool
Checking the XY Table Level
1.
Remove the substrate from the Z Stage table.
2.
Mark a location on each corner of the platen surface with a marker, see
These marks will be used to reference the same locations when leveling the table.
3.
Attach a dial indicator to the head bracket.
4.
Attached the head to the toggle head assembly.
5.
Move the dial indicator to the back left (BL) corner over the marked location.
6.
Raise the Z Stage until it contacts the dial indicator. Continue to raise the Z stage
approximately two additional revolutions of the dial indicator. Wedge a screw driver or
similar object between the underside of the table and the bottom of the chamber to
prevent the Z stage from moving downward.
7.
Zero the dial indicator (this is the reference position and will always be zero).
8.
Next move the XY table until the dial indicator is over the front left (FL) corner mark
Figure 5-360.
uPrint/uPrint SE Service Manual
Figure 5-360: Z stage table location points
BL (Back Left)
FL (Front Left)
Measure and record the difference (e.g. the dial indicator reads 0.004 in.)
BR (Back Right)
FR (Front Right)
Figure 5-360.
5-43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uprint se plusUprint plusUprint se

Table of Contents