Operating Instructions; Checklist Before Starting; Drilling Step-By-Step - General International 75-155 Setup & Operation Manual

15, 17 & 20 inch drill presses - variable speed
Hide thumbs Also See for 75-155:
Table of Contents

Advertisement

OPERATING INSTRUCTIONS

CHECKLIST BEFORE STARTING

VERIFY ALL CHECK POINTS BEFORE STARTING. FAILURE TO COMPLY CAN RESULT IN SERIOUS INJURIES.
Make sure the pulley cover is closed.
Check that the chuck is installed properly.
Make sure the chuck guard is securely installed and closed properly.
When turning the machine "ON" be aware that the shaft will rotate freely.
When the drill press is running check to see if it runs without vibration or shaking.
Make sure the table bracket moves up and down smoothly.
Make sure the spindle shaft turns smoothly.

DRILLING STEP-BY-STEP

1.
Lift the chuck guard as shown and install a drill bit
suitable for the type of material to drill.
3.
Secure the workpiece in a vise (optional).
5.
Turn ON the machine and adjust the speed.
20
2.
Flip the chuck guard down in place as shown.
4.
For precision drilling use the laser pointer A to lo-
cate the drilling point on the workpiece.
6.
Use the downfeed handles to lower the bit into the
workpiece.
A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

75-16575-510

Table of Contents