Working With Device Guide; Reference Data For Preparing A Device Guide Frame - Keysight Technologies 16197A Operation And Service Manual

Bottom electrode smd test fixture
Table of Contents

Advertisement

Operation

Working with Device Guide

Working with Device Guide
To measure a DUT whose size does not fit any frame in the attached device
guide, it is necessary to prepare a suitable device guide frame. Prepare a frame
with reference to the dimensions of the blank device guide shown in
and the electrode positioning shown in

Reference Data for Preparing a Device Guide Frame

Figure 3-7
Dimensional Drawing of a Blank Device Guide
Figure 3-8
Electrode Positioning
A guide holder is placed onto the device guide.
diameter of the guide holder. Figure
the pressure rod.
Keysight16197A Operation and Service Manual
Figure
3-8.
Figure 3-9-A
Figure 3-9-B
shows the movable range of
Figure 3-7
shows the inside
31

Advertisement

Table of Contents
loading

Table of Contents