Central Station General Maintenance - Welch Allyn Connex Directions For Use Manual

Central station
Hide thumbs Also See for Connex:
Table of Contents

Advertisement

80 General maintenance

Central station general maintenance

General preventive maintenance consists of basic cleaning of equipment, inspection, and
verification of the equipment and system operation. Only a trained biomedical engineer
should perform these tasks.
Perform general preventative maintenance according to the following schedules:
Service activity
Cleaning and
maintenance
Note
Frequency
Component
Annually
CPU
Display
Keyboard
Mouse
Printers
Use only approved cleaning solutions according to your facility's guidelines
and the manufacturer's recommendations.
®
Welch Allyn Connex
Action
Power down the CPU.
Open the CPU case and remove any dust
build up.
Power down the display.
Clean the display and the control buttons.
General cleaning.
Disassemble the mouse.
Remove any dust or debris build up.
General cleaning.
Clean external cooling vents.
Refer to the printer directions for use for
additional cleaning and maintenance
information.
Central Station

Advertisement

Table of Contents
loading

Table of Contents