IBM SAN192C-6 Installation, Service And User Manual page 71

Ibm storage networking
Hide thumbs Also See for SAN192C-6:
Table of Contents

Advertisement

Note: This unit is intended for installation in restricted access areas. A restricted
access area can be accessed only by using a special tool, lock and key, or other
means of security.
Note: Only trained and qualified personnel should be allowed to install, replace,
or service this equipment.
Note: Before you install, operate, or service the system, see the IBM Systems Safety
Notices for important safety information.
Use this procedure to install the switch on top of the rack-mount support brackets.
Procedure
1. Verify that the rack-mount support brackets are level and securely attached to
the rack-mounting rails, the support rack-mount support brace is securely
attached to the brackets, and the rack is stabilized.
2. Slide a mechanical lift under the switch and lift the switch up onto the
rack-mount support brackets, ensuring it is squarely positioned.
3. Attach the switch to the rack-mounting rails. See the "Required Equipment" on
page 45.
CAUTION:
We recommend grounding the chassis, even if the rack is already grounded.
There is a grounding pad with two threaded M4 holes on the chassis for
attaching a grounding lug.
Installing the Switch on the Shelf Brackets
This section provides general instructions for installing the switch on top of the
shelf brackets.
About this task
For detailed information about the items required for installation, see the
"Required Equipment" on page 45.
The IBM c-type SAN Director Shelf Bracket Kit can be used to support the switch
in a non-threaded rack. This shelf bracket kit can be used as a permanent support
when installing a IBM c-type SAN Director in a rack that meets the requirements
listed in the "Rack Requirements" on page 41.
Note: This unit is intended for installation in restricted access areas. A restricted
access area can be accessed only by using a special tool, lock and key, or other
means of security.
Note: Only trained and qualified personnel should be allowed to install, replace,
or service this equipment.
Note: Before you install, operate, or service the system, see the IBM Systems Safety
Notices for important safety information.
Use this procedure to install the switch on top of the shelf brackets.
Procedure
1. Verify that the shelf brackets are level and securely attached to the
rack-mounting rails, the crossbar is securely attached to the shelf brackets, and
the rack is stabilized.
Chapter 2. Rack Installation
47

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

San768c-6San384c-6

Table of Contents