Uncrating & Placement; Install Discharge Paper Tray; Start--Up & Tools Kit; Electrical Connections - Scott Edge Reinforcer Instruction Manual

Table of Contents

Advertisement

2.3
Uncrating & Placement
The machine will arrive in one crate. Inspect the external condition of the crates for visible signs of damage
before opening. If damage is noticeable, notify the carrier and Scott Equipment before proceeding with the
installation.
To assist in the ease of installation, the machine is disassembled prior to shipping and requires some minor
assembly before the machine is operational.
2.3.1
Main Machine
Step: 1. Remove metal banding straps from cardboard surrounding shipping crates.
!
CAUTION
EXTREME CAUTION MUST BE EXERCISED WHEN MOVING MACHINE TO INSTALLATION
LOCATION TO PREVENT DAMAGE.
Step: 2. Use a fork lift to place the main machine shipping skid near the designated floor area of operation.
Step: 3. Remove lag screws holding machine to shipping skid.
Step: 4. Raise main machine with fork lift, remove shipping skid assembly from under machine.
Step: 5. Lower main machine to floor.
Step: 6. Remove all protective wrapping from machine.
Step: 7. Remove front and rear covers and place them aside so they won't be damaged.
Fig. 2-3. Discharge Paper Tray
2.3.3
Start- -Up & Tools Kit
The machine is shipped a variety of tools and parts required to set the machine up for production. Unpack
box and lay all parts from kit on table top to inventory against the included packing list.
2.4
Electrical Connection
2.4.1

Electrical Connections

The machine requires 110V 15 Amp Service.
Electricity to the machine is delivered through "United States" style plug.
Note !
Electrical cords going to machine should be routed overhead and be of sufficient height to
allow personnel to travel around entire machine without interference.
Edge Reinforcer Issue 1
2.3.2

Install Discharge Paper Tray

The discharge paper tray is shipped uninstalled.
2 Installation
2- -5

Advertisement

Table of Contents
loading

Table of Contents