Set Up Machine For Production; Set Heat Controller For Running Heat Seal Tapes; Threading Mylar Into Machine - Scott Edge Reinforcer Instruction Manual

Table of Contents

Advertisement

3.3

Set Up Machine for Production

Fig. 3-12. Heat Controls
A
Fig. 3-13. Mylar Feed & Cut Area Locator
Edge Reinforcer Issue 1
F
D
B
C
3.3.1
Set Heat Controller For Running
Heat Seal Tapes
The heat controller for the rollers is located on the
operator's panel.
Step: 1. Set temperature to 190_F on Heat
Controller.
Step: 2. Turn the Heater to ON.
NOTE!
The optimum temperature is between
190
Keep the temperature as low as
possible to prevent tape stretch and
the removal of water from the paper.
The heaters will come up to
temperature in about 3 to 5 minutes.
3.3.2

Threading Mylar Into Machine

A -- Strip Applying Roller
B -- Roller
C -- Cut Off Package
D -- Tape Position Roller
E -- Pull Out Roller
F -- Cross Over Roller
E
3 Operation
- 200