Pre-Installation Requirements - Scott Edge Reinforcer Instruction Manual

Table of Contents

Advertisement

2 Installation
2.2

Pre-Installation Requirements

The environmental requirements of the Scott Edge Reinforcer must be considered well in advance of the
actual installation. Providing a well suited operating environment will help ensure a trouble free installation
process. Consideration should be given to the following items:
Power, location and rating of power connections.
Floor strength
Level floor
Adequate space must be provided around all four sides of the machine to permit normal operation and
maintenance procedures. The figure shows the minimum space required.
3' (914mm)
Fig. 2-2. Scott Edge Reinforcer Space Requirements
Space should be allocated near the paper tray for a small table that can be used for small jobs, samples,
etc.
Provide plenty of space In front of the machine so large jobs can be easily moved in and out with skids or
carts.
2- -4
3' (914mm)
12
3' (914mm)
3' (914mm)
Edge Reinforcer Issue 1

Advertisement

Table of Contents
loading

Table of Contents