Uncrating & Placement; Crate 1 -- Main Machine - Scott 10,000 Instruction Manual

Table of Contents

Advertisement

2.3
Uncrating & Placement
The machine will arrive in two crates. Inspect the external condition of the crates for visible signs of damage
before opening. If damage is noticeable, notify the carrier or Scott before proceeding with the installation.
To assist in the ease of installation, the machine is disassembled prior to shipping and requires some minor
assembly before the machine is operational.
Fig. 2-3. Scott Ten Thousand - - Crate 1
LEVELING SCREWS
LAG SCREW
Fig. 2-4. Remove Lag Screws from Shipping
Skid
C9999- -2 Issue 1
2.3.1
CONTROL
PANEL
BRACE
Step: 1. Remove metal banding straps from
Step: 2. Use a fork lift to place the main machine
Step: 3. Remove four lag screws holding machine
Step: 4. Raise main machine with fork lift, remove
Step: 5. Lower main machine to floor.
Step: 6. Remove all protective wrapping from
Step: 7. Remove front and rear covers and place
Crate 1 - - Main Machine
cardboard surrounding shipping crates.
CAUTION!
EXTREME CAUTION MUST BE
EXERCISED WHEN MOVING MACHINE
TO INSTALLATION LOCATION TO
PREVENT DAMAGE.
shipping skid near the designated floor
area of operation.
to shipping skid.
shipping skid assembly from under
machine.
machine.
them aside so they won't be damaged.