6. After measuring time the installation must be
brought back into its original condition (remove hos-
es and open gas shut-off valve).
7. After the pressure in the instrument reduced itself
(or after pressing <Enter>), the result is displayed
and can be printed with <Print>.
8. If the menu „Usability check" is selected again,
so the result can be called up with <F4> (as long as
the ecom-DP3 is on) or a new measurement can be
started with <F1>.
ecom-DP3
Usability check
acc. to TRGI 2018
Measurement completed!
Remove tubes!
Continue with <Enter>
Forward w.:
Usability check
acc. to TRGI 2018
Measurement
Leak rate
Ini. temp.
End temp.
Difference
Forward w.:
Usability check
acc. to TRGI 2018
Start new
measurement?
Select:
NO
YES
Page 17
5:00min
1.51l/h
22.6°C
22.6°C
0.0°C