Replacing A Strong-Current Box - Huawei NetCol5000-A User Manual

42 kw air cooled in-row precision air conditioner
Hide thumbs Also See for NetCol5000-A:
Table of Contents

Advertisement

NetCol5000-A 42 kW Air Cooled In-row Precision Air
Conditioner
User Manual
----End

5.4.12 Replacing a Strong-current Box

Prerequisites
Procedure
Step 1 On the controller home screen, tap Shutdown, and turn off the air conditioner switch in the
PDC. Check whether the port is energized. (Use a multimeter to check that the AC voltage of
the port is 0 V.)
Exercise caution because the device is still energized after it is shut down on the controller
home screen.
Step 2 Open the rear door and remove the air filter.
Step 3 Remove the power cables and terminals shown in
Issue 01 (2017-07-27)
A component inside the electric control box, such as the main control board, circuit
breaker, AC contactor, fuse, or fuse base, needs to be replaced.
A spare electric control box of the same model is available and functional.
Tool: Phillips screwdriver
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Operation and Maintenance
Figure 5-47
using a Phillips screwdriver.
196

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents