E5@C Controller Setup; Checking Operation - Omron E5CC Communications Manual

Digital temperature controllers. e5*c series
Hide thumbs Also See for E5CC:
Table of Contents

Advertisement

6-11-4 E5@C Controller Setup

Set up programless communications. Perform the procedure that is given in 6-4-4 E5
Setup.

6-11-5 Checking Operation

The SP and RUN/STOP status of the E5@C Controllers will be changed to check operation. Make sure
that this will not create any problems in the controlled system.
 Checking E5CC Monitor Values
(1) Place the PLC into Monitor Mode.
Select Monitor Mode from the Monitor/Simulator Menu on the KV STUDIO.
(2) The PLC Memory Dialog Box will be displayed.
Select Batch Monitor Mode from the Monitor/Simulator Menu on the KV STUDIO.
(3) Change the display format to make the values easier to check.
Select the first display format and change it to Signed decimal 16 bits.
(4) We will check the E5CC monitor values.
The area where monitor values are checked is called the upload area.
DM0 to DM14 is the upload area for the No. 0 Controller, DM30 to DM44 is the upload area
for the No. 1 Controller, and DM60 to DM74 is the upload area for the No. 2 Controller.
E5@C Digital Temperature Controllers Communications Manual (H175)
6 Programless Communications
@
C Controller
6
6 - 89

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E5ecE5cc-uE5acE5dcE5gc

Table of Contents