Hardware installation for Synchronous Mirroring and Asynchronous Mirroring | 153
The following figure shows the cabling that is described in Step
page 153.
1.
Host Fibre Channel cable
2.
Storage array Fibre Channel cable
3.
Fibre Channel cable dedicated for mirroring
7. Connect controller port B1 of the primary storage array to an available port in zone 3 of switch 2.
8. Connect controller port A2 of the primary storage array to an available port in zone 2 of switch 1.
In a four-host-port system, connect controller port A4 to an available port in zone 2 of switch 1.
9. Connect controller port B2 of the primary storage array to an available port in zone 4 of switch 2.
In a four-host-port system, connect controller port B4 to an available port in zone 4 of switch 2.
Upon activation of the Synchronous Mirroring feature or the Asynchronous Mirroring
Note:
feature, controller port A2 and controller port B2 are reserved for mirror relationship
synchronization. In a four-host-port system, controller port A4 and controller port B4 are
reserved.
10. Connect controller port A1 of the secondary storage array to an available port in zone 1 of switch
1.
The figure following Step
9
through Step
on page 153.
11. Connect controller port B1 of the secondary storage array to an available port in zone 3 of switch
2.
12. Connect controller port A2 of the secondary storage array to an available port in zone 2 of switch
1. In a four-host-port system, connect controller port A4 to an available port in zone 2 of switch 1.
13. Connect controller port B2 of the secondary storage array to an available port in zone 4 of switch
2. In a four-host-port system, connect controller port B4 to an available port in zone 4 of switch 2.
13
on page 153 shows the cabling described in Step
6
on page 152 through Step
6
on page 152
9
on

Advertisement