Quantum StorNext QD7000 Hardware Manual page 153

Hide thumbs Also See for StorNext QD7000:
Table of Contents

Advertisement

Hardware installation for Synchronous Mirroring and Asynchronous Mirroring | 145
1.
Host Fibre Channel cable
2.
Storage array Fibre Channel cable
3.
Fibre Channel cable dedicated for mirroring
4.
Fabric uplink cable
Switch zoning for the campus configuration
The campus configuration allows for a separate zone for each reserved port for the Synchronous
Mirroring feature or the Asynchronous Mirroring feature.
The switches do not need to be zoned exactly as presented in this configuration. However, you must
meet the following requirements when you zone switches for the campus configuration.
Note:
Do not zone the uplink ports (E_ports) on any of the Fibre Channel switches.
You must have a total of four zones in this configuration.
All zones exist on fabric 1 (switch 1A at the primary site, and switch 1B at the secondary site).
Zone 3 and zone 4 are reserved for the dedicated Synchronous Mirroring feature connections.

Advertisement

Table of Contents
loading

Table of Contents