Input Shaft; Transport Tires; Blade Installation - Progressive Turf Equipment TDR-30 Operator's Manual And Parts List

Rotary finish mowers
Table of Contents

Advertisement

OUTER WING DECK SHAFTS
1. Connect the PTO shaft end with the longer guard cone to the outer shaft of the main wing deck
gearbox. Connect the opposite end to the outer wing deck gearbox.
2. Connect the outer PTO guard chains to the locations shown.

INPUT SHAFT

1) Remove ½" UNC retaining bolt/nut from input shaft.
2) Remove notification tag from intermediate shaft hanger bearing, ensure gold coloured spacer ring is
present against bearing inner race.
3) Disconnect input shaft shield at clamp yoke end and slide shield exposing the clamp yoke (see input
shaft service instructions in mower manual storage tube).
4) Install input shaft clamp yoke on intermediate shaft, ensuring gold coloured spacer ring is in place
between the input shaft yoke and hanger bearing race.
5) Reinstall ½" UNF retaining bolt in input shaft yoke, torque to 85 ft-lb.
6) Reinstall input shaft shield per input shaft service instructions.
7) Fasten input shaft guard retaining chain to mower main frame with sufficient slack as to not bind or pull
during turns.

TRANSPORT TIRES

1) Check air pressure in the tires and adjust according to specifications on sidewall

BLADE INSTALLATION

Blades & attaching hardware for the TDR22 mower are shipped loose with the machine and must be installed
before use. Blades must be installed in accordance with instructions on page 45 of this manual.
TDR-30 Operator's Manual
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tdr-22

Table of Contents