Chapter 13
Store and Load Programs with a Secure Digital Card
194
5. Click Load/Store.
6. On the nonvolatile memory load/store dialog box, click Load.
A dialog box prompts you to confirm the load.
7. To load the project, click Yes.
After you click Load, the project is loaded into the controller as indicated by
the controller status indicators. These conditions can exist:
• While the load is in progress, the following occurs:
– The controller resets itself.
When the controller is resetting itself, the status indicators execute a
sequence of state changes, for example, a brief time with the OK
status indicator in the solid red state. Wait for the controller to
complete the sequence.
– After the controller fully resets itself, the OK indicator is solid green.
– The SD indicator is off.
Rockwell Automation Publication 1769-UM022C-EN-P - June 2018