Optional accessories

Optional items and accessories that may accompany the S530 system:
1. Cables to connect to the test fixture or the probe card adapter
2. Model 9139A-PCA (probe card adapter)

Site preparation and installation

Site preparation checklist

The follwing table provides a site preparation checklist to help you prepare your site for the S530 system in your
facility. If you find that an item listed is not valid for your site, then you can indicate it with "N/A."
Table 2: S530 system preparation checklist
Site
Item
Is adequate and proper electrical power available?
Is something connected to the same power source that generates noise?
Is something that requires substantial amounts of current connected to the same power source?
Is it necessary to have lifting equipment?
Is the flooring adequate and able to support the weight of the system while moving from receiving to
the final destination?
Are all of the corridors and hallways able to allow clearance for the system?
Are stairways adequate for moving the system through?
Are elevators needed to move equipment? Can they support the size and weight of the system?
Are the doorways wide enough for the system?
Floor plan
Item
Did you complete the system layout (see
Does your layout show all of the locations for all of the equipment?
Does your system layout show the locations of all doors and aisles?
Does you layout allow for the proper clearance of the system for the front, rear, and the
keyboard/monitor arm (see
Is there enough space for personnel safety, comfort, and freedom of movement?
Did you take future expansions into consideration?
Is there sufficient space for any supplies or manuals?
Electrical
Item
power
Did you verify that your site's power meets the power requirements for the system?
Did you prepare power outlets for service, or testing, or maintenance?
PA-992 Rev. D / April 2012
Floor
plan)?
Figure
10)?