UPS2000-G-(1 kVA-3 kVA)
User Manual
Figure 3-2 Rack-mounting the UPS
----End
Tower-mounting a UPS
Step 1 Remove the UPS front panel.
Step 2 Rotate the control panel 90 degrees clockwise.
Step 3 Rotate the logo 90 degrees clockwise on the front panel. Reinstall the front panel.
Step 4 Assemble support bases. The minimum distance between two support bases should be 150
mm.
Step 5 Place UPS on the support bases in sequence.
Step 6 Adjust the UPS and the support bases to be horizontally.
Figure 3-3 Tower-mounting the UPS
Figure 3-4 Tower-mounting the UPS