3. Defrost Flow Chart
The defrosting shall proceed by the integrating operation time, outdoor temperature
and outdoor heat exchanger temperature as follows.
Normal defrost
Compressor
integrating
operation:
Over 40min.
Tn < - 17°C
=
Tn-Tn10 < - 5deg
Tn-Tnb < - 2deg
However, Tn < - 6 °C
=
Heating operation start : Compressor ON
Defrost start
Defrost Indicator:
[Operation indicator]
6sec. ON / 2sec. OFF
Outdoor heat exchanger temperature:
Over +16°C
or
Compressor ON time: Maximum 15min.
Defrost end
01-17
(Not defrosted for 10min.)
Integrating defrost
(Constant monitoring)
Compressor
Compressor
OFF count :
integrating
operation:
40 times
(Less than 10min.)
Over 240min.
Outdoor
heat exchanger
temperature:
Below - 3°C
Compressor OFF
Outdoor fan motor OFF
50sec. later four - way valve OFF
55sec. later compressor ON
Compressor
integrating
operation:
Over 215min.
Outdoor
heat exchanger
temperature:
Below - 5°C