Preparing For Installation; Checking The Delivery - Siemens SIMATIC IOT2050 Starterkit Product Information

Hide thumbs Also See for SIMATIC IOT2050 Starterkit:
Table of Contents

Advertisement

Preparing for installation

2.1

Checking the delivery

Procedure
1. When accepting a delivery, please check the packaging for visible transport damage.
If any transport damage is present at the time of delivery, lodge a complaint at the
shipping company in charge. Have the shipper confirm the transport damage
immediately.
2. Unpack the device at its installation location.
3. Keep the original packaging in case you have to transport the unit again.
Note
Damage to the device during transport and storage
If a device is transported or stored without packaging, shocks, vibrations, pressure and
moisture may impact the unprotected unit. A damaged packaging indicates that ambient
conditions have already had a massive impact on the device.
The device might be damaged.
Do not dispose of the original packaging. Pack the device during transportation and
storage.
4. Check the contents of the packaging and any accessories you may have ordered for
completeness and damage.
– Device
– DC connecting terminal, already plugged into the device.
– One mounting accessory kit including: 1 x Rail clamp, 2 x mounting brackets and
6
screws.
SIMATIC IOT2050 Starterkit
Product Information, 06/2021, A5E50831253-AA
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents