Step
10
The following WARNING appears.
Click Continue.
11
The following dialog box appears,
Select the Automatically change ALL control elements to the state selected in
"Post Load State" after load is completed checkbox and click OK.
11
On the Monitoring-Assignment window, you can notice that device on the
Project-Assignment window has been loaded to the corresponding FF link.
12
Right-click the device, and then click Activate >> Selected Item(s) and
Content(s). The device is commissioned.
ATTENTION
Note that after importing the DD, you have to create control strategies.
Page 10
FOUNDATION Fieldbus ST 700 Pressure Transmitter User's Guide
Action
Revision 2.0