Installation and commissioning flowchart

Identify the frame size of your drive: R2, R3, R4, R5
or R6.
Plan the installation.
Check the ambient conditions, ratings, required
cooling air flow, input power connection, compatibility
of the motor, motor connection, and other technical
data.
Select the cables.
Unpack and check the units.
Check that all necessary optional modules and
equipment are present and correct.
Only intact units may be started up.
Check the installation site.
If the drive is about to be connected to an IT
(ungrounded) system, check that the drive is not
equipped with EMC filtering.
Install the drive in a cabinet.
Route the cables.
Check the insulation of the motor and the motor
cable.
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com
Task
See
Technical data:
IEC data
or
Technical data
Planning the electrical installation
Option manual (if optional equipment is
included)
Mechanical installation:
Unpacking the unit
If the converter has been non-operational for
more than one year, the converter DC link
capacitors need to be reformed. Ask ABB for
instructions.
Mechanical installation:
Before installation
Technical data
ACS800-04/U4:
Type code
For instructions on how to disconnect the EMC
filtering, contact ABB.
Mechanical installation
Planning the electrical installation:
cables
Electrical installation:
Checking the insulation of
the assembly
19
NEMA data
Routing the
About this manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs800-04Acs800

Table of Contents