Installation and commissioning flowchart

Identify the frame size of your drive: R5 or R6.
Plan the installation.
Check the ambient conditions, ratings, required
cooling air flow, input power connection, compatibility
of the motor, motor connection, and other technical
data.
Select the cables.
Unpack and check the units.
Check that all necessary optional modules and
equipment are present and correct.
Only intact units may be started up.
If the drive is about to be connected to an IT
(ungrounded) system, check that the drive is not
equipped with EMC filtering intended for grounded
systems, or disconnect the EMC filter capacitors.
Check the installation site.
Install the drive on a wall or in a cabinet.
Route the cables.
Check the insulation of the motor and the motor
cable.
Task
See
Technical data / IEC data
Technical data
Planning the electrical installation
For compliance with the European Union EMC
Directive, see
Technical data: CE marking.
Option manual (if optional equipment is
included)
Mechanical installation: Unpacking the
If the converter has been non-operational for
more than one year, the converter DC link
capacitors need to be reformed, see
Maintenance: Capacitors.
Type code
Electrical installation: IT (ungrounded)
Mechanical installation: Before installation
Technical data
Mechanical installation
Planning the electrical installation: Routing the
cables
For compliance with the European Union EMC
Directive, see
Technical data: CE marking.
Electrical
installation:
Checking the insulation of
the installation
Introduction to this manual
23
or
NEMA data
unit.
systems.