Installation And Commissioning Flowchart - ABB ACS800-37-0060-3 Hardware Manual

Acs800-37 series drives (55 to 2700 kw / 75 to 3000 hp)
Table of Contents

Advertisement

20
Motor control and I/O board (RMIO)
control and I/O board and its specifications.
Installation checklist and start-up
installation of the drive.
Maintenance
Fault Tracing
Technical data
sizes and technical requirements, provisions for fulfilling the requirements for CE
and other markings and warranty policy.
Dimensions
Resistor braking
and resistors.

Installation and commissioning flowchart

Plan the installation.
Check the ambient conditions, ratings, required
cooling air flow, input power connection, compatibility
of the motor, motor connection, and other technical
data.
Select the cables.
Unpack and check the units.
Check the type code indicated by the type
designation label with the original order. If the drive is
about to be connected to an IT (ungrounded) system,
check that the drive is not equipped with EMC/RFI
filtering +E202. Check that all necessary optional
modules and equipment are present and correct.
Only intact units may be started up.
Check the installation site.
Route the cables.
Mount the cabinet line-up.
Check the insulation of the motor and the motor
cable.
About this manual
contains preventive maintenance instructions.
contains troubleshooting instructions.
contains the technical specifications of the drive, e.g. ratings, frame
contains information on the dimensions of the drive.
describes how to select, protect and wire optional brake choppers
Task
shows external control connections to the motor
helps in checking the mechanical and electrical
Technical data
Planning the electrical installation
Option manuals (if optional equipment is
included)
Mechanical installation
The ACS800-37
For instructions on how to disconnect the EMC/
RFI filtering, contact your local ABB
representative.
If the converter has been non-operational for
more than one year, the converter DC link
capacitors need to be reformed. Contact your
local ABB representative for more information.
Mechanical
Planning the electrical installation: Routing the
cables
Mechanical installation
Electrical
installation:
the assembly
See
installation,
Technical data
Checking the insulation of

Advertisement

Table of Contents
loading

Table of Contents