Pressure Switch Testing With Contact Resistance Measurement - GE Druck DPI 610 User Manual

Portable pressure calibrator series
Hide thumbs Also See for Druck DPI 610:
Table of Contents

Advertisement

Taking Measurements

Pressure Switch Testing with Contact Resistance Measurement

A
B
A - External pressure source (indicator instruments only)B - Pressure regulator
C - Pressure switch under test
To perform switch test with contact resistance measurement, select P-SWITCH and
proceed as follows:
INPUT
ZERO
To ensure accurate measurements it is recommended that the zero procedure (that
compensates for the resistance of the test leads) is carried out before performing this
test.
Note: Allow sufficient time after contact closure for the resistance to stabilize.
Connect Vin +, SW + and
Connect Vin +, SW + and
mA in + together.
mA in + together.
Connect switch test leads
Connect switch test leads
across switch symbol.
across switch symbol.
Open circuit test leads
Open circuit test leads
Press ENTER to continue.
Press ENTER to continue.
The switch test is performed in the same way as the previous
section, except that the contact resistance is measured and
displayed with the results.
SELECTIONNER
SELECTIONNER
FONCTION
RESIST
OFF
Now short test leads.
Now short test leads.
Press ENTER to continue.
Press ENTER to continue.
FCT. : P-PRESSOS
MODE ENREG. RAPIDE
ETAT CONTACT
SELECTIONNER
RESISTANCE
FONCTION
RESIST
ZERO
Switch Resistance input
Switch Resistance input
now ready for use.
now ready for use.
Open circuit test leads.
Open circuit test leads.
Press ENTER to continue.
Press ENTER to continue.
15
C
DPI 615
24V OFF
bar
DEMARRER
F1
F2
SELECTIONNER
ZERO
ON
TASK : P-SWITCH
SNAPSHOT MODE
CONTACT STATE
RUN
FCT.: P-PRESSOS
MODE ENREG. RAPIDE
ETAT CONTACT
FERME A
bar
OUVERT A
bar
HYSTERESIS
DEMARRER
K415 Issue No. 1
24V OFF
bar
24V OFF
15.060
14.059
1.001
bar

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Druck dpi 615

Table of Contents