C
- Pre-operation inspection

3 - Inspection and Functional test

3.1 -
D
AILY INSPECTION
Each day before the beginning of a new work session and with each change of operator, the machine
must be subjected to a visual inspection and a complete functional test.
• Never use a defective or a malfunctioning aerial work platform.
• If any item on the check list is marked "No" during the inspection; machine must be tagged and placed
out of service.
• Do not operate the machine until all identified items are corrected and it has been declared safe for
operation.
In case of loose fasteners, refer to torque table value in maintenance book.
In case of leaks, replace the damaged part before use.
In case of structural part deformation, cracks, broken weld, paint chips, replace the part before use.
Inspection Forms are provided to assist your inspection process.
We recommend these forms to be completed daily and stored to assist with your maintenance
schedule.
Each action is depicted in the daily inspection sheet using the following symbols.
Visual inspection without
disassembly
Drain
Check levels
Visual inspection with small
disassembly or movement
needed to reach the part.
Replacement is necessary.
4000415480
Samp le of broken welds
Lubrication-Grease
Test and validate
Systematic replacement
Proof tests : Need HAULOTTE Services® authorization. For countries where
machines are not subject to controlled periodic maintenance.
E 01.18
Functional adjustments
Tighten
USA / GB
A
B
C
D
E
F
G
H
I
57

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optimum 1931 e

Table of Contents