Pre-Operation Inspection; Recommendations - Haulotte optimum 8 Operator's Manual

Hide thumbs Also See for optimum 8:
Table of Contents

Advertisement

OPTIMUM 8 - OPTIMUM 1931 E
C

- Pre-operation inspection

Pre-operation inspection

1 - Recommendations

The owner, the site manager, the supervisor and the operator are all responsible to ensure the machine
is fit for the work it is to perform; i.e. that the machine is suitable to carry out the work in complete safety
and in compliance with this Operator's Manual. All managers who are responsible for persons
operating the machine must be familiar with the local regulations currently applicable in the country of
use and ensure that they are adhered to.
Before using the machine, read the previous chapters in this manual. Ensure that you have understood
the following points :
• Safety precautions.
• Operator's responsibilities.
• Conditions and the operating principles of the machine.
4000415480
E 01.18
USA / GB
55
A
B
C
D
E
F
G
H
I

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optimum 1931 e

Table of Contents