4.
Attach the rails to the rack posts. See Figure
a.
Secure the front of the rail to the front of the rack post with customer‐supplied screws in
the top and bottom screw holes.
b. Secure the mounting bracket to the back of the rack post with customer‐supplied screws
in the top and bottom screw holes.
The SSA rail kit does not include screws for attaching the rails and mounting brackets to the
rack posts.
5.
Tighten the 6‐32 screws that secure the mounting brackets to the rails.
6.
Slide the SSA onto the rails until the front of the SSA is against the front of the rack posts.
7.
Secure the front of the SSA to the rack by screwing the customer‐supplied rack screws in the
mounting ears on the right and left front of the SSA.
8.
(Optional) Secure the rear of the SSA to the rails. See "Securing the SSA to the Rear of the
Rails" on page 2‐11.
You can now unpack and install the SSA power supplies. See "Unpacking the Power Supplies" on
page 2‐12 and "Installing the Power Supplies" on page 2‐13.
2‐5.
Enterasys S-Series Stand Alone (SSA) Hardware Installation Guide 2-9
Mounting the SSA