Dent ELITEpro XC Operator's Manual page 24

Table of Contents

Advertisement

4) Connect the white wire on the CT to the positive terminal on the measuring device.
5) Connect the black wire on the CT to the negative terminal on the measuring device.
CT 1 must be placed on the phase listed as V High for Channel
1 in the ELOG setup table. CT2, CT3 and CT4 must also
correspond to the appropriate phase as shown in Channels 2,
3, and 4 in the ELOG setup table.
DENT
Instruments
ELITEpro
Prepping & Using the ELITEpro
Current
Transformer
connections
Voltage lead
connections
D
of a CT is required to ensure
proper measurement. If an arrow
is shown on the CT label, it should
be pointed toward the load.
Otherwise, use the instructions
printed on the CT.
Y
K
? Correct orientation
ID
OU
NOW
24

Advertisement

Table of Contents
loading

Table of Contents