Mindray BA-88A Service Manual page 67

Semi-auto chemistry analyzer
Hide thumbs Also See for BA-88A:
Table of Contents

Advertisement

6
After mounting the pump shell, install the pump head on the pump.
7
After installing the pump head, connect the tubing with the tubing that goes
through the backboard and the waste tubing. The pump tubing on the left
should be connected to the tubing that goes through the backboard, the
pump tubing on the right to the waste tubing.
8
After connecting the tubing, slip the tubing that goes through the backboard
into the analyzer until the adapters does not expose to the outside.
9
Check the installation for any errors. Connect the analyzer to the power
supply and calibrate the pump. Please refer to the relevant part of the
operator's manual for calibration method.
5 Service and Maintenance
Install
the
pump
head on the pump,
with
the
motor
shaft
into
the
installation hole
Pinch
the
buckles to lock
the pump head
The pump tubing on
the left should be
connected
to
the
tubing
that
goes
through
the
backboard.
the pump tubing on
the right to the waste
tubing.
5-15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents