ABB TZIDC-200 Operating Instructions Manual page 16

Electro-pneumatic positioner. for 4 ... 20 ma two-wire technology, hart, profibus pa, foundation fieldbus
Hide thumbs Also See for TZIDC-200:
Table of Contents

Advertisement

Mounting
Procedure:
1. Attaching follower guide to actuator
Fig. 6
IMPORTANT (NOTE)
Hand tighten the screws.
Attach the follower guide (1) and clamp plates (2) with screws (4) and spring washers (3) to
the actuator stem.
2. Assemble the lever (unless preassembled)
Fig. 7
Insert spring (8) on bolt with follower pin (9).
Slip the plastic washer (7) onto the bolt and compress the spring with it.
Insert the bolt with compressed spring into the oblong hole in the lever (6) and fasten it in the
desired position using the plain washer (5) and nut (4) at the lever. The scale on the lever
indicates the link point for the stroke range.
Place the washer (2) on the screw (1). Insert the screw in the lever and lock with the nut (3).
16
TZIDC-200, TZIDC-210, TZIDC-220
42/18-85-EN

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tzidc-220Tzidc-210

Table of Contents