2-12. Pinch Arm Unit Replacement
(Removal)
1.
Refer to item "2-10.Pinch Solenoid Replacement"
to remove the Pinch Solenoid Unit.
2.
Remove the cut washer (A) and remove the
Pinch Solenoid Lever as shown in Figure 2-12.
3.
Remove the cut washer (B) and remove the
Pinch Arm Unit as shown in Figure 2-12.
(Installation)
1.
Install the new Pinch Arm Unit following the
removal steps in reverse order, and then Pinch
Solenoid Position Adjustment is necessary.
Figure 2-12
2-13. Loading Motor Replacement
(Removal)
1.
Disconnect the connector (A) on the P.C.Board
(A). (Please refer item "7. Table of Connector"
about reference number of connector and name
of P.C.Board.)
Click this mark
Connector".
2.
Remove the Pinch Solenoid Unit. (Refer to item
2-10).
3.
Unscrew the screw (B), and remove the
Emergency Shaft as shown in Figure 2-13.
4.
Unscrew the 2 screws (C) and remove the
Loading Motor Neutral Unit as shown in Figure
2-13.
5.
Unscrew the 2 screws (D) and remove the
Loading Motor Unit as shown in Figure 2-13.
(Installation)
1.
Install the new Loading Motor Unit to Loading
Motor Neutral Unit by tightening 2 screws (D) as
shown in Figure 2-13.
2.
Install the Loading Motor Neutral Unit by
tightening the 2 screws (C) as shown in Figure
2-13, paying attention to the pin of Mode SW Unit
which should match with groove position of main
Cam Gear.
3.
Install the Emergency Shaft by tightening the
screw (B) as shown in Figure 2-13.
4.
Install the Pinch Solenoid Unit and after
installation it, Pinch Solenoid Position adjustment
is required. (Refer to item 1-11).
5.
Connect the Connector (A) to the P.C.Board
(A).
MECH-42
, then go to item "7. Table of
Figure 2-13