This submenu is used to set the parameters required to communicate with the
System Manager CIP over the serial port using the Point-to-Point Protocol.
Screen 50
General Settings
Clicking on General Settings in the submenu screen for PPP Settings will
display the following screen.
Screen 51
This screen is used to enable the Point-to-Point Protocol (PPP) and to select
the appropriate modem type.
User Manual
Lorain Power System (AP6C55CA/CB)
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.