Fig. 2.6.1 Mains Power Supply - Honeywell IPC5000 Installation Manual

Universal programmable controller
Table of Contents

Advertisement

Wiring Diagrams
1) Connection of power supply input terminal
PROTECTIVE BONDING (grounding) of this controller and the enclosure in which it is
installed shall be in accordance with National and local electrical codes. To minimize
electrical noise and transients that may adversely affect the system, supplementary bonding
of the controller enclosure to a local ground, using a No.12(4 mm
recommended.
CAUTION
To prevent product damage and failure, do not connect power supply cable to PE
terminal.
WARNING
Make sure that wiring to the main power supply is disconnected from the site AC source
before installing wiring.
100~240VAC
50~60Hz
L1(H)
L2(N)
Fig. 2.7.1 Mains Power Supply
Hot
Neutral
Earth Ground
- 11 -
AC Line
Voltage
2
) copper conductor, is

Advertisement

Table of Contents
loading

Table of Contents