Main unit
12
Needle bar case final assembly attachment
1. Rotate the pulley until the base line on the pulley is at the top.
2. Apply MOLYKOTE EM-30L to the roller 1 of the thread take-up
differential lever.
3. Attach the needle bar case final assembly to the case bracket assembly with
the 4 screws 1.
*Key point
• Align the thread take-up boss b on the thread take-up lever
assembly with
align the thread take-up boss c with the roller
thread take-up differential lever.
• Align the case guide D a with the case positioning plate
assembly
A
4. Move the case positioning shaft assy 2 on the case positioning plate
assembly toward you, and firmly tighten the nut (2, M4) 3.
5. Adjust the vertical position of the thread take-up differential lever so that
the needle bar case final assembly lightly moves right and left. Firmly
tighten the screw 2.
Apply MOLYKOTE EM-30L to the roller of the thread
take-up differential lever.
Tightening torque of nut (2, M4):
1
2
Needle bar unit
on the case guide UL assembly, and then
B
Bolt, Socket
M4X16
Bolt, Socket
M5X12
3 - 58
C
on the
1
Size of a grain of
rice
1.18 - 1.57 N-m
Torque
1.18 — 1.57 N-m
Torque
2.94 — 3.43 N-m
1
2
3
2