Arm Bed And Base Frame Disconnection - Brother PR655 Service Manual

Hide thumbs Also See for PR655:
Table of Contents

Advertisement

Main unit
1

Arm bed and base frame disconnection

1. Mark the position where the arm bed is attached to the base frame. Mark
the position on the base frame.
*Key point
• Marking prevents miss-location during re-assembly.
2. Remove the 4 screws 1 and the 4 plain washers (M8), and then remove
the arm bed from the base frame.
2
Idle pulley assembly removal
1. Remove the 4 screws 1, and then remove the 2 bushing pressers.
2. Remove the idle pulley assembly 1.
3
Idle pulley disassembly
1. Remove the 2 screws 1, and then remove the set screw collar, thrust
washer, idle pulley, and second thrust washer.
2. Remove the retaining ring E7 from the idle pulley shaft.
3. Remove the 2 ball bearings from the idle pulley.
Lower shaft unit
2 - 59
1
1
1
1
1
Retaining rings E7
1
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pr655c

Table of Contents